Off to the next round ... Once again the horticultural was there. This time he even had to write something so that in future there are no misunderstandings. We get our carport drain pipe, the size of the terrace has been set, the height of the terrace wall we have agreed (which will still be adjusted), and he thought even a few things we would not have occurred.

The schedule provides that can be set in about two weeks of carport. Deleted or primed we get the wood from the assembly no longer has to be the first to dry for a few weeks of the impregnation, but that is bearable.