As our Snag list since mid-November in some critical points do not move and we start next week, especially with the horticultural , we met again with property developer and construction manager. (NB:. Define next time clear where the meeting takes place)

main issues again were things that had promised the construction manager actually initially, but then eventually went under or relating to permanent change at some point irrelevant were. There is, for example the story of the entrance stair railings, which was included in the original offer from developer and was mentioned several times, as our Front door at about 1.20 m above the sidewalk and is thus a stair railing is required (according to VOB).
much more important (and time-critical), however, the damage to the site (eg separating the sidewalk stones) by the construction vehicles that will not pay for property developers, and do not start without the garden repair the farmer can.

And as always, we went with some concessions, but the vague feeling that we somehow more could knock out again after about 3 hours from home.

: - /

0 comments:

Post a Comment